The Quay Commander Option extends the conventional planning process and fully integrates with all N4 Planning and Control modules. Quay Commander requires:

To verify that your site meets the requirements, see your N4 administrator.

Before you can schedule crane activity, you must:

For more information on planning the load or completing any of these tasks, see the relevant topics in this book, depending on your site’s XPS configuration, the manual Navis N4: Vessel Administrator and User Guide, and the N4 online help.

If you use the AutoStow Option to load vessels, see Vessel AutoStow Option (on page 1). If you use the Equipment Control Module at your site, see the manual Navis N4: Equipment Control Administrator and User Guide.